Sample boq for apartments. It ensures transparency and precise cost estimation.
Sample boq for apartments Modular wardrobes, TV units, false ceilings, wall claddings, kitchen modulars and other items are specified along with quantities and rates. It Tópicos, 2017. 02 NAME OF WORK Repairing and overhauling of i) head snub drum size 1600 x 400 x 10mm (standby) and ii) head snub drum size 1600 x 400 x 10mm (standby) of new bunker washed coal in RLB Section of Kathara Washery. Address: This document provides a bill of quantities for the construction of a G+1 residential building. Description Unit Qty. Any body can use it as a format for preparing a bill of quantities in Nigeria. Backfilling will be completed in layers and compacted to 98% density The Purpose and Benefits of a Bill of Quantities 1. 6. GENERAL The nature of this contract is measured unit price contract and the Bill of Quantities (BOQ) shall reflect this fact. Transparent Project Evaluation. Which means that this is a popular structure for bills of quantities. The template includes line items for substructure works, superstructure works, roof works, plastering and other finishes, gates doors and windows, and provisional items. The concrete work section estimates reinforced concrete for foundations, columns, beams and slabs. 4 million for BOQ 1 works and nearly Rs. The total direct costs estimated are over PhP 5 million. The document provides a bill of quantities for excavation, concrete, formwork and steel reinforcement works for a septic tank project. This estimate provides the materials, labor, and costs to improve the bedroom and bathroom in G. Whether you’re building a single-family home, a multi-unit residential complex, or a commercial office, a well-prepared BoQ provides a comprehensive breakdown of the materials, labor, and services required to complete the project. It includes multiple sections covering mobilization, construction layout, formwork and scaffolding, concrete work, finishing carpentry, windows and grills, stairs and railings, roofing, tile work, plumbing, and more. It includes items for excavation, concrete, reinforcement, carpentry works, and other materials. It includes 10 items describing the civil works, materials, and labor needed. It includes quantities and units for various civil works like demolition, masonry, waterproofing, flooring and plumbing works. ) quantity amount (rs) 201 granular sub-base cm 1,937. 2 Item Description Unit QTY Rate Amount 1 Socket Outlet Supply and install the following 3-pin socket outlet complete with cover plate in the position as indicated on the drawings, draw boxes measured elsewhere. Cu. It details the materials, quantities, unit costs, and total costs for earth works, structural works, carpentry works, roofing works, electrical works, painting and finishing works. 2 including replacement of angle and channel etc. Winsy Dissanayake. It is usually prepared by a cost consultant or a surveyor. This document is a bill of quantities (BOQ) for electrical wiring and lighting work for a bungalow in Khandala Valley. The total estimated project cost is not provided as the rates are for estimation purposes only and actual quantities would need to be confirmed BUNGALOW ITEM DESCRIPTION QTY UNIT RATE AMOUNT SUBSTRUCTURES-(CONTINUED) Plain concrete (1:4:8) in A 50mm Thick blinding to strip foundation 44 SM 300 13,200. A comprehensive BoQ promotes transparency in project evaluation. boq dubai - Free download as Excel Spreadsheet (. A. 5m setting out and earth works 1. This document provides a breakdown of costs for various site construction and building works. xlsx from ENGINEERIN 1065 at Addis Ababa University. BOQ shall be read and construed in conjunction with other Contract Documents. The height of the house is assumed to be 10-12 feet, which accounts for the capacity to consume bricks. For the BOQ for each Part of the Contract, the Bidder shall not change the entries under Pay Item No. The BoQ plays a pivotal role in cost estimation. 20FO0100 - Standard Bidding Document / BOQ (Rev 1) Page 11 of 26. The document contains a bill of materials listing various structural items, their dimensions, quantities required, unit weights, and total weights. Civil Engineering (BSCE 3) 537 Documents. May 25, 2019 · In a series of posts, I'll try to describe in details the various items/elements of work contained in a BOQ. 16 e 3 Pin KSEB Socket - 2 no. Course. The total estimated cost . It also (ideally) details the terms and conditions of the construction or repair approved make commerical Plywood/Block board (as per sample approved by the Architect/SBIIMS) for all the items of Interior & Furniture works. 2,311 bricks are estimated to be required for the foundation and structure of the 2 bedroom house. It also includes concrete work such as plain cement concrete, reinforced cement concrete for various structural elements, grade slabs, and foundation for a water tank. (Column 1), Pay Item Description (Column 2), Unit (Column 3), and Quantity (Column 4) in the Bill of Quantities, which are set by the Procuring Entity. Quantities and units are provided for each work item. 1. Bill of Quantities: The heart of the BoQ, this section provides detailed itemized lists of materials, labor, equipment, and associated costs for each construction task. 17 Philippine Pesos. It is a guide only. 00 A Bill of Quantities (BOQ) is a vital document in the construction industry, meticulously listing all the materials, labor, and equipment necessary for completing a construction project. Specify the quantity and unit rate for each item to automatically calculate total costs. Which include details the terms and conditions of the construction contract and itemizes all work to enable a contractor to price the work for which he is bidding. pdf), Text File (. It also includes spreading soil and manure, planting grass, shrubs, hedges and trees. BILL OF QUANTITIES FOR THE CONSTRUCTION OF PROPOSED BLOCK OF 6 X 3 - BEDROOM ACCOMODATION Serial DESCRIPTION QTY UNI 117 23 73KB Read more Apr 5, 2023 · The BOQ (short for Bill of Quantities) is a document that lists all the materials, labor, and equipment needed to complete a construction project. The tenderer to include in their prices VAT of 16% in all rates. It includes costs for excavation, concrete work, masonry work, block work, roofing, damp proofing, carpentry and joinery, aluminum and metal work, plastering, finishing, glazing, painting, and electrical and sanitary installations. LENDING WITH BOQ Version Number: 20 Effective Date: 20 July 2020 Important: This is NOT a full version of the Bank of Queensland’s home loan policy. 2. The total project cost is estimated to be 1,969,512. 57 2 a) For footings Cum 222. - Earthworks like scarifying existing surfaces, construction of embankments, subgrades and shoulders from excavated This document is a bill of quantities for HVAC works for a building project. It provides BILL OF QUANTITIES ITEM NO. We accept : Quick Contacts Phone: (+94) 716 100 400 (WhatsApp) (+94) 773 226 623 (WhatsApp) naraengineering@gmail. For each pay item in the BOQ, the Bidder shall indicate its unit bid price in words and in NMT LOT 2 BoQ Bill No. g. Manager (E&M)/NIQ/2020-21/400 Estimating costs and creating a Bill of Quantities (BOQ) is a crucial step in planning and executing interior design projects. It includes estimates for various construction elements such as excavation and substructure work, reinforced concrete framing, upper floors, roofing, stairs, external walls, windows and doors. This document provides a cost estimate for a proposed two-storey residential building project. It includes costs for 227 unreinforced 750mm diameter primary piles, 228 reinforced 750mm diameter secondary piles, 62 unreinforced 900mm diameter primary piles, and 63 reinforced 900mm diameter secondary piles. It also provides a summary of estimated costs totaling over Rs. It includes 17 line items describing the quantities of various construction elements for interior and exterior walls, floors, roofs, doors, windows, and other items across three floors (ground, first, and second floors). It also states that further works not explicitly detailed would be included in the rates Contractors Sign and Stamp Page 4 of 7 3 Pind UPS Sockets - 2 no. : Serial Number for tracking items This document appears to be a bill of quantities (BOQ) for renovation works. The document notes that all rates should include necessary costs for supply, transport, and installation. It serves as a communication tool between client, consultant & the contractor. 00 This document provides a bill of quantities for construction of a 2 bedroom unit. 01 NAME OF WORK Fabrication, erection and repairing of 79 and 80 belt conveyor gentry iron supporting structure no. Mar 27, 2018 · View bill of quantities. Download scientific diagram | Sample Output for the NRM2-Based Algorithm in the BOQ template from publication: BIM-Based Bill of Quantities Generator following POMI and NRM2 Methods of Measurement 1. It lists 20 line items with descriptions of work like earthwork, foundation work using concrete and reinforcement, brickwork, plastering, woodwork, stone and tile work, and painting. 00 to 0. 31 , kandy road , k 640 80 412kb read Bill of quantities. 30 pesos, and electrical What is a Bill of Quantities (BOQ)? A Bill of Quantities is a structured document that outlines the quantities and costs of all materials, labor, and services required for a construction project. 95 5 This document contains a standard bill of quantities (BoQ) template for a community market place construction project. This document contains a bill of quantities for the construction of a 3-classroom block. The document provides a detailed breakdown of materials and work needed for the landscaping project. Cement Oct 11, 2024 · A Bill of Quantities (BoQ) is one of the most essential tools for managing costs and ensuring transparency in construction projects. The second estimate reduces the equipment cost per kilogram by 60% and labor cost per kilogram by 38%, bringing the total cost down to $858,487. It lists line items for excavation, concrete work including foundations, slabs and structural elements, masonry, metals, doors and windows. txt) or read online for free. The items include general requirements, earthworks, concrete, masonry, metals, wood and finishes. 2 sub-base and base code description unit rate (rs. The documents provide estimates for electrical installation work for the proposed Rameshwaram Residency project in Sikar. 39. It includes estimates for earth works like excavation, embankment construction and subgrade work. 3. 1 Wiring for 5/6 pin, 6/16 ampere plug point with 4 sq. bill of quantities volume ii for egerton road, lahore issued to : issued on : sign of issuing officer : securities and exchange commission of pakistan interior renovation of secp cro, 3rd &4th floor, associated house, 3 days ago · See Condo F1R for rent at 8401 W Sample Rd in Coral Springs, FL from $1900 plus find other available Coral Springs condos. A The Bill of Quantities has been measured in accordance with the Australian and New Zealand Standard Method of Measurement of Building Works, 2018 edition (hereafter referred to as the ANZSMM. Customize the sheet by adding or removing sections based on project needs. Samarasinghe's house in Viyanduwa, Haburugala. It provides a Sample BOQ - Free download as Excel Spreadsheet (. BILL OF QUANTITY (BOQ) ADDIS ABABA LOW COST APPARTMENT BUILDING Item A54-540 Test and Samples and inspection of materials A54-560 Extra Cost of Authorized Overtime A54-570 Extra Cost of Substructursl Work A54-580 Provision of Spares A55-210 Labour (Net cost of Daywork Labour) A55-220 Materials ((Net cost of daywork materials) A55-410 Plant (Net cost of daywork plant) TOTAL PRELIMS 4 510 000. Finished work must conform in all This document provides a bill of quantities for a standard concrete science classroom building project. Based on collected details through these two methods contextualized semi structured interview sessions were conducted to identify the acceptability of deviations in BIM based BOQ for the Sri Lankan construction industry. 5m x 2. The document quantifies elements like plastering, cladding summary of bill of quantities routine maintenance work (km 00 to km 14) bill no. The total materials cost is PHP 71,428. It includes 372 light points, 8 twin control light points, 222 socket boxes, 8 heavy duty sockets, 1600 meters of 2x1. ITEM UNIT QTY RATE AMOUNT A EARTHWORK 1 Cum 91. 1kV grade,PVC insulated copper conductor cable in PVC casing & capping with providing and fixing 5/6 The bill of quantities (sometimes referred to as 'BoQ' or 'BQ') is a document prepared by the cost consultant (often a quantity surveyor) that provides project specific measured quantities of the items of work identified by the Bill of Quantity (BOQ) Definition: It is a document used in bidding. General directions and description of work and material given in the Technical Apr 3, 2020 · A bill of quantities is a document used in tendering in the construction industry in which materials, parts, and labor are itemized. Newin works innovatively with Developers at the conception phase of projects to assist in establishing project feasibility studies and cost proposals, allowing Developers the opportunity to advance their initial stages of the project life cycle and establish more detailed designs. We break up the project into phases and then you can list the labor and material costs to figure out a budget. Four fuel dispensers and associated equipment will cost $169,100. 2) It includes costs for preliminary works like site preparation, water connection, and landscaping. The total estimated cost is 13,110,030. 110 650 71,500. It lists various construction items with their unit and quantity. It provides a detailed breakdown of materials, parts, and labor required for a construction project. 6 Toilet and Bath sqm. xlsx), PDF File (. 28 iii) For Floor area Cum 86. It breaks down every aspect of the project, covering structural elements, finishes, and mechanical and electrical systems in detail. Unit Rate (AED) Amount (AED) i. Jun 18, 2019 · Your essential guide to producing a Bill of Quantities A Bill of Quantities (BoQ / BQ) is a document prepared to allow the quantification and costing of construction works and may be prepared during several stages on a project for all of the works or a sample of the works . The concrete section lists quantities, unit costs, and total costs for various concrete pouring and formwork activities, including footings, tie beams, columns, and suspended floor slabs. The article examines Wittgenstein's thought on the language of pain in first and third person. The document provides detailed specifications and measurements 2. Note B This Bill of Quantities shall form part of the Contract and shall be priced in This document provides a bill of quantities for electrical installation works for a 2 bedroom unit. mm 1. Without a doubt, estimation and bill of quantities are at the heart of any project. This document provides a bill of quantities for the plumbing and sanitary system installation works for the Success Tower project. From the findings Sample BOQ [Bill of Quantities] - Civil Works, Road, Electrical, Box Culvert, HVAC, Plumbing, Mechnical, PWD, NHAI, Painting. 25 1. No Description Unit Rate Quantity Amount ; A : All works must be according to drawings, specification and engineer instructions. It also provides quantities for sub-base and base course materials as well as bituminous works like tack coat, dense graded bituminous macadam and asphalt The Bill of Quantities for a 4-bedroom house in Uganda provides a detailed breakdown of the expected costs and materials required for constructing a residential property with three bedrooms and a master suite. Masonry estimates include stone and block wall Contoh BOQ for Renovation & ID Work - Free download as Excel Spreadsheet (. It lists 24 line items with descriptions of the work, quantities, units, and rates. (G) On the completion of Works. It includes demolishing existing structures, constructing new foundations and walls, installing windows and doors, and renovating finishes. Sheet 1 In Words : Pesos In Figures : Pesos In Figures : Pesos Jun 28, 2015 · Bill of Quantities (BOQ) Building. It includes 12 elements such as substructure, building frame, walls, roof structure, windows, doors, floor finishes, wall finishes, roof finishes, roof water drainage, lightning protection, and fixtures and furniture. The document provides a bill of quantities for the construction of a proposed factory building for Brandix Intimate Apparel Ltd in the Katunayaka EPZ. Students shared 537 documents in this course. An overall project estimate is provided Bill of Quantities - Free download as PDF File (. Regularly This document provides a bill of quantities (BOQ) for civil and interior work at a residential plot. The BOQ includes 16 items for earthworks, drainage, pavement works, and bitumen surfacing. The estimated costs for other elements such as Jun 22, 2015 · 2. Specifications are provided for BILL OF QUANTITIES TOTAL UNIT COST AMOUNT 2 Damproofing and waterproofing 2. at no. INDIAN ACADEMY OF SCIENCES at Bangalore. For each line item, the template specifies the work description, unit, specification, quantity, unit cost Jan 30, 2024 · Si. m 3. Maxwell Mutinda. Contractors and clients can obtain a realistic projection of expenses, aiding in financial planning and decision-making. boq office and residential. It includes three divisions: general requirements, site works, and concrete. Header Section. 6 Polyurethane sheet sqm. A BOQ helps to eliminate the 'guesswork' and also minimise discrepancies in the tender documents. Quantities and units are provided for each item along with sub-totals for each section and an overall total. com info@nara. The total estimated cost is provided for each area. CIVIL WORKS Sl. x 5/15 A with seperately controlled 15 A indicator switch. Primarily there are two types of BOQs Apr 10, 2018 · HVAC BOQ Sample xls - Bill of Quantities for HVAC Work - 4/10/2018 04:23:00 PM Bill of quantities (BOQ) is an itemized list of materials, parts, and labor with their costs required to construct, maintain, or repair a specific structure or project such as HVAC projects. Steel reinforcement and formwork are also estimated. University Saint Louis College. com has 3D tours, HD videos, reviews and more researched data than all other rental sites. List all required materials and tasks in the Bill of Quantities (BOQ) section. 3. BOQ Template (2) Bill of Quantities BOQ Excel Template Free Download _____ Common FAQs About BOQ for House Construction What is the role of a BOQ in construction? A BOQ serves as a vital tool in construction by providing a detailed cost breakdown, facilitating budgeting, procurement, and project management. It includes items for the substructure, reinforced concrete work, formwork, reinforcement bars, walling, roofing structure, and roof covering. 95 203b asphaltic base course (class-b)** cm The document is a work breakdown structure (WBS) for a two-storey residential building project. What is a Bill of Quantities? Steps to Prepare a BOQ. 3 MASONRY WORKS 3 CHB 6" for exterior walls smooth finish sqm. xls / . 4. Apr 7, 2024 · To use the building estimation Excel sheet effectively:Fill in project details such as project name, client information, and project location. Simplify your process with itemized lists and transparent pricing breakdowns. ), save and except where stipulated herein to the contrary. 1 Preliminaries/General and Provisional Sums 1. Adjustments: As the project progresses, the BOQ may be updated to reflect changes in design, materials, or labor costs. This document provides a bill of quantities for road construction works. The bill of quantities BOQ or BQ is a document prepared by the cost consultant that provides project specific measured quantities of the items of work identified by the drawings and specifications in the tender documentation. Apartments. x 5 A Bill of Quantities for Proposed Residential Development Lekki - Free download as PDF File (. The total estimated cost for the entire project is 1,010,944. DESCRIPTION PAYMENT MODE QTY. The work includes primary and secondary light point wiring, two-way light point wiring, power point wiring, laying of circuits, installation of switchboards, earth pits, and other electrical This document provides a bill of materials and cost estimates summary for the construction of a two-story mixed-use building with a total building area. txt) or view presentation slides online. 1 for the Contactor's Overheads This document contains a bill of quantities for fit-out works for an OWNER at an unspecified Location. It serves as a critical communication tool between project stakeholders, including contractors, project managers, architects, and quantity surveyors. Some of the major tasks listed include earthwork, concrete work, brick masonry, woodwork, flooring, tiles, plastering, painting and other Jan 6, 2016 · Elevator Bill of Quantities. It lists materials, quantities, and unit costs for items including: trenching and laying pipes of various diameters; constructing valve chambers; a 60m3 elevated water tank made of concrete and rebar with inlet/outlet pipes; and a water kiosk building with foundation, walls, floor, and finishing items Plumbing BOQ Final - Free download as Excel Spreadsheet (. Relevant grammatical differences, according to the typical analytical method of this philosopher, are highlighted not only in relation to the two perspectives, but also regarding the use of cognitive verbs such as 'feeling' and 'knowing'. 3D Floor Design Package; 2D Floor Design Package; R/E Experts Opinion; Want-To-Know. Under this bill of quantities structure, items are ordered by individual products or works (work sections). Retain approved samples and specimens on Site for comparison with the finished work. 18 Birr, which includes a 10% contingency This document provides construction specifications for a proposed four storey apartment building in Guizo, Mandaue City, Cebu, Philippines. (F) Mode of payment to be mutually agreed between Contractor and the Employer at the commencement of contract in relation to the Programme of work. This article will guide you through the steps to prepare a BOQ. The document provides a bill of quantities for electrical work including supply and installation of main electrical panels, distribution boards, cables, wiring, and other components. & DATE P. Formwork quantities total 203. This document provides a bill of quantities for the construction of a three bedroom flat. This document contains two construction project estimates for installing structural steel. Item Cost Unit Price Qty. The total estimated cost for substructure work is 5,167,525. The document provides a scope of work for interior fitout of a flat, including detailed items and quantities for different areas like the master bedroom, other bedrooms, living room, kitchen, and bathrooms. 2Include a percentage on Item 1. It includes 10 sections detailing items like general requirements, walls, flooring, ceilings, railings, doors/windows, painting, cabinetry, electrical works, and miscellaneous items. 147,654. The following columns should be included in the BOQ Excel format: S. ELECTRICAL BILL OF QUANTITIES BILL NO. v1 to ETD. Nos. The first estimate has higher equipment and labor costs, coming to a total cost of $1,451,800. overheads, profit, attendance) but shall be exclusive of the contractor's obligations for GST Note ABBREVIATIONS Where the following abbreviations have been used in this Bill of Quantities they shall have the meanings as indicated below: um - micro metre mm Sep 3, 2024 · Initial Estimate: Often forms the basis for the BOQ. xlsx This document is a bill of quantities for the design and construction of piling, excavation, and dewatering works for a 30-storey hotel and residential apartment building in Dubai. Additional costs included are for transport, taxes bill of quantities for lokwii water supply project-(distribution line, kiosks, troughs and water storage steel tank 50m3 item2 descriptions unit qty rate amount item 2 1 boq for concrete roofed water kiosk 2. 9 million naira, including project supervision fees. Sample BOQ - Free download as Excel Spreadsheet (. Quantities and unit prices are listed for each item. Table of Contents. It includes estimates for wiring, switches, boxes and other electrical accessories for both LIG (2BHK) flats and EWS (1BHK) flats. Academic year: 2021/2022 The document is a bill of quantities for the receiving hall of the New La Union Adventure Park project in Sarangani Province, Philippines. Summary: The summary section presents a consolidated overview of all costs categorized by work sections. Mobilization and demobilization of Construction machinery required to execute the Works This document provides a bill of materials and costs for a fuel station project in Hawiyah, KSA. It includes estimated costs for site clearing, preliminary works, excavation and earthworks, concrete works, masonry works, doors and windows, finishes, painting, and external works like storm water drains and paving. Workshop equipment is budgeted at $190,000. It outlines specifications for site preparation including clearing, excavation, backfilling and staking out building lines. It includes items for excavation and earth works, concrete works, and formwork and reinforcement. ] o o } ( Y µ v ] ] X Z ] µ t } l ï rD Ç r í ô W } i E µ u W ð ñ ñ Z À ì This document contains a bill of quantities (BOQ) for road improvement works from 0. The quantities of each work item are provided in standard units like cubic meters, square meters, and kilograms. The total cost for each element is calculated based on the unit rates and quantities provided. High Rise Apartment +1 (484) 430 This document contains a bill of quantities for the construction of a G+2 residential building. 99 with additional costs for labor The main purpose of a Bill of Quantities is to itemise and define a project so that all tenderers are preparing their price and submission on the same information. It ensures transparency and precise cost estimation. It includes items for supplying and installing water pumps, pipes of various diameters, valves, and an overhead water tank. - Item 2 The document provides a bill of materials and cost estimate for a proposed 3-storey apartment building project. The document provides a detailed itemized list of materials, quantities, units, and rates for the construction of a multi-story building. Bill of quantities for a residential apartment. 01 general site clearance and setting out sm 12. Acceptance of any loan A/3 VOLUME II OF II: TENDER NO. It includes site works such as site clearance, excavation, filling, and anti-termite treatment. Chapter 3-Activity BOQ If you are not a planning engineer but interested in learning this step, I advise you to proceed further with this course using the sample data provided, then you can enroll to our Professional Planning Engineer PPE- Course where you will learn how to perform such tasks and create a detailed time schedule cost Sample BOQ 2016 - Free download as Excel Spreadsheet (. PREAMBLE TO BILL OF QUANTITIES (BOQ) 1. It includes itemized estimates for concrete works, block works, roofing, aluminum works, finishing works, glazing, painting, sanitary installation, electrical installation, and lift installation. BOQ. 05 cubic meters of C25 reinforced concrete. The WBS will be used to estimate the total price of the building project. xlsx from BS ACCOUNT 101 at Philippine School of Business Administration, Quezon City. PROPOSED: TWO STOREY RESIDENTIAL HOUSE OWNER: ROGIEMAR GERODIAS LOCATION: BAGUIO BOQ. It also details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding. It also specifies requirements for concrete works including forms, reinforcement, and finishes. The cost is broken down by work type, including structural works at 5,445,560. 2) It provides details of each type of counter such as materials, sizes, quantities, and rates. x 5A & 1 no. BOQ Structure. It includes 22 line items with descriptions of work like jungle clearing, excavation, laying of aggregate base courses and bituminous surfacing. This document provides a bill of quantities for landscaping work. 02 N0. The answer to that can be found in a Bill of Quantities, or BoQ in short. It includes 16 line items with descriptions and totals for materials, labor, and contingencies. No. For each pay item in the BOQ, the Bidder shall indicate its unit bid price in words The document outlines the Bill of Quantities (BOQ) for plumbing and drainage systems in the proposed construction of Daham House. 67 b) For foundation Cum 18. bill of quantities for proposed diocesan office and commercial complex for kurunegala diocese. This document provides a bill of quantities for the proposed residence of Mr. It includes items such as: - Wiring using PVC/SC copper cables for lighting circuits and socket outlet circuits - Various lighting points and switches - Lighting fittings such as single light bulbs - 13A and 15A socket outlet plates - PVC conduits for cable management The document contains This document provides a bill of quantities for roads and pavements construction with item descriptions and estimates of materials needed. Rooms, doors, windows and finishes are allocated $4,380,000. A Construction Plant, Tools & Machinery. 72 cubic meters of C5 lean concrete and 24. It includes 9 items with detailed estimates for materials, labor, and total costs for concrete works, masonry works, steel works, roofing works, painting works, tileworks, plumbing works, electrical works, and doors and windows. Today, we will talk about how to prepare a bill of quantities, in 6 easy steps. UnitItem DescriptionNo. Some key elements that will be constructed include excavations and foundations, concrete slabs, masonry walls, timber trusses, galvanized roof sheets, external doors This document contains a bill of quantities for the construction of a 2-classroom block with office and store. 42 pesos. Scribd is the world's largest social reading and publishing site. This document provides a bill of quantities for the construction of a residential building in Gampaha for Mr. How can I ensure the accuracy of my BOQ? A bill of quantities can help you make more accurate forecasts of construction costs, but using our free construction estimate template for Excel can help sharpen those figures. I've had prospective home owners reach out to me asking about information on what it would cost to build a four bedroom bungalow to foundation level or what it would cost to just roof their homes still under construction. Under civil works, it provides details of quantities for demolition, anti-termite treatment, construction of new walls and plastering, waterproofing of toilets, marble flooring and skirting This document provides a bill of quantities for the construction of 26 residential buildings. A Bill of Quantities (BoQ) lists the total materials required to complete the architect's design for a construction project, such as a house or other structure. Some key items listed include: - Site clearance works like clearing vegetation, dismantling existing structures like culverts and bridges. Bill Of Quantities For The Construction Of Proposed Block Of 6 X 3 - Bedroom Accomodation. 05. It includes 3 pages detailing items needed for the substructures, superstructure, roof construction, and external openings (doors and windows). SAMPLE BOQ FOR FOR ITEM RATE or (%) RATE QUOTATION BILL OF QUANTITY (BOQ) SI No. 75 202 aggregate base course cm 2,275. NIQ NO. Notes provide that labor includes installation of trusses, unit prices Jan 24, 2022 · View 3. SAMPLES Where samples of commodities or specimens of finished work are specified, submit samples or specimens to the Architect and obtain his approval before confirming orders or carrying out the work. A good BOQ is important to help you showcase the right estimate which ultimately builds up the client’s confidence in you. Insurance and Securities This document appears to be a bill of quantities for construction materials and labor for a building project. 86 pesos, masonry and roofing works at 2,935,885. It breaks the project down into 13 major items with various sub-items. Bricks. 67 ii) For Foundations Cum 7. The total cost for materials and labor is estimated at 1. at Raw Coal Section of Kathara Washery. It details specifications for water supply connections, sanitary fittings, drainage systems, and related works including the construction of septic tanks and grease traps. 126 1,350 170,100. The total estimate is for supply and Samples and Materials Generally clause and cost of testing The contractor is drawn to the legal notice in the Finance Act part 3 section 21(b) which requires VAT payments on all contracts. Accurate Cost Estimations. 02 203a asphaltic base course plant mix (class-a) cm 18,744. The substructure element includes items for site preparation, excavation and earthworks Sample PEB BOQ - Free download as Excel Spreadsheet (. It lists 19 items with descriptions, units, quantities, and rates for various construction works including excavation, formwork, reinforcement, concrete, masonry, carpentry, sanitary works, plastering, electrical works, painting, and miscellaneous works. 3- Reinforced concrete (1:2:4) for foundation of the walls The cost includes provision and fixing of reinforcing steel bars and fixing of needed spacers according to the drawings. x 5A controlled by 2 no. The total costs are broken down into costs for substructure works (A rates included in this Bill of Quantities shall include for all related costs (e. This document provides a summary of quantities for a civil BOQ (bill of quantities) for a construction project. Work section. 3) The total cost carried over to summary for all the counters is Rs. Both estimates break down costs for items like columns This document provides an estimate for improvement works on the Bolape Mahamedagama road from kilometer points 0+450 to 1+250. 5mm wiring, and other items like telephone and TV outlets, conduit, MCB distribution boards, isolators and miniature circuit breakers. It also provides costs for leveling, foundations, reinforced concrete, brickwork walls, roofing, plastering, painting, ceilings, doors and windows, and tiling. Apr 25, 2018 · Download plumbing bill of quantities (BOQ), an excel sheet for all plumbing work BOQ - free download Download Free MEP Calculation Excel Sheets, AutoCAD Drawings, and Training Courses for HVAC, Firefighting, Plumbing and Electrical Systems Design. 75 km of the Danthure Uduwela Road. Miscellaneous works including signage This document provides a cost estimate for water pipelines, a water tank, and water kiosk. Key items include a 200A main panel, lighting/power distribution boards, a UPS distribution board, wiring and circuits for room AC, signage, strong rooms, and other equipment. xls), PDF File (. Helpfully, it’s the one our bill of quantities template uses. lk. The total cost of the project is estimated to be 10,801,645. This document provides a bill of materials and cost estimate for the proposed construction of a 3-story residence with penthouse located at 27 Plaridel Street, Quezon City. It includes quantities in cubic meters for excavation, backfill and surplus material removal. SUB- STRUCTURE (Foundation) ITEM DESCRIPTION OF WORKS UNIT QTY RATE AMOUNT 1 CEMENT bags 2 SAND lorry 3 BALLAST lorry 4 HARDCORE lorry 5 Bill of Quantities for a 2 Bedroom House in Uganda. Construction; Tools. Construction of Group housing apartments namely NBCC Heights, at Sector-89, Patudi road, Gurgaon (Haryana) - Supply, Installation, Testing and Commissioning of 13 passenger Capacity elevators and 15 passenger capacity The document provides a bill of quantity for the renovation of kitchens and installation of modular kitchens in 6 flats. Anchor Text Generator; Keyword Research Tool lending discretion, and this document is not to be relied upon or represented as the ban’s current policy. The rate shall be inclusive of anti termite coating on all sides to plywood, teak wood & all the other wooden components of Asian paints or equivalent approved make. 3 CHB 4" for interior walls smooth finish sqm. The document SAMPLE BOQ FOR FOR ITEM RATE or (%) RATE QUOTATION BILL OF QUANTITY (BOQ) SI No. BOQ - Building of Quantity adalah dokumen awal yang dibuat bagi memulakan sesuatu projek pembangunan. However, with limited knowledge and time we often neglect making them to precision. It includes 12 items describing the external sewerage system, external water supply system, and rates for each item. It includes 37 line items with descriptions of construction materials and tasks, quantities needed, unit rates, and total amounts. This document provides a bill of materials and cost estimate for a 2-storey residential project. KCAA/011/2019-2020 EP19/12/L01 Main Block – Foundation and Ground Floor Layout Sections 1:75,1:25 EP19/12/L02 This document provides an estimate for electrical works of a boys hostel. Prepare a ÐÏ à¡± á> þÿ { þÿÿÿfå F. It includes items for site preparation through excavation and soil restoration. 2- Plain concrete (1:3:6) under the reinforced concrete of the foundation of the walls and the footings of the columns or wherever needed 3 Cu. Manager (E&M)/NIQ/2020-21/374 1) This document provides a bill of quantities for the proposed construction of a 4 bedroom residential house in Kigali, Rwanda. Republic of the Philippines Department of Public Works and Highways OFFICE OF THE DISTRICT ENGINEER Camarines Sur 1st District Engineering Office Baras, Canaman, Camarines Sur Bill of quantities for the Proposed Construction of Hostel building for M/s. 16 square This document provides a bill of quantities and specifications for the construction of a 5-story mixed use building. Jul 4, 2019 · Bill of Quantities also referred to as BOQ, is a document formulated in the construction industry to specify materials, labors, and their cost. Labor costs are also estimated Nov 23, 2023 · A Bill of Quantities (BOQ) is an essential part of the building construction industry. 64 The document is a bill of quantities for the proposed renovation of a residential apartment in Kaduna, Nigeria in August 2016. We can provide feasibility studies and cost analysis of future sites and projects ranging from $1 million up to BILL OF QUANTITIES/ MATERIALS ESTIMATE A. This document provides a bill of quantities (BOQ) for the construction of a proposed residential building in Chennai, India. It includes estimates for excavation, concrete work, masonry, roofing, metal work and finishing. The total estimated cost for the civil works is LKR 3,364,799. It provides a detailed breakdown of the costs associated with each item, making it easier to estimate the total cost of the project and track expenses throughout the construction process. 3) The the deviations of BIM based BOQ from the Sri Lankan conventional BOQ. O(KTW)/Dy. Quantities, unit rates and Bill of Quantities (BOQ) 2 Bedroom Flat (BOQ) 3 Bedroom Flat (BOQ) 4 Bedroom Flat (BOQ) 4 Bedroom Duplex (BOQ) Floor Design Plans. Revolutionize your construction endeavors with our Construction Bill of Quantities (BoQ) Template! Leave clichés behind and embark on a journey of precise project cost estimation. The header should include essential project details: Project Name: “Residential Building Project” BOQ Reference Number; Client Name; Consultant/Contractor Details; Date of Preparation; Column Headings. It lists various HVAC equipment and materials including fresh air handling units, chilled water fan coil units, split units, chilled water pumps, a pressurization unit, parking extract fans, jet fans, staircase fans, a garbage room extract fan, ductwork, insulation, acoustic lining, and flexible ducts. The document provides a bill of quantities for the construction of a proposed G + 1 floor private villa in Dubai. PC Sum 1. 1,1 16A 3-pin single outlet Supply No 60 R R Install No 60 R R 1,2 16A 3-pin double outlet Page 2 of 16. The scope of work involves dismantling existing kitchens, providing marble and granite support structures, installing wall and floor tiles, sinks, pipes, and prefabricated modular kitchen units See Condo SFRS for rent at 1480 E Sample Rd in Pompano Beach, FL from $1500 plus find other available Pompano Beach condos. 8 850 6,800. It includes two underground storage tanks for gasoline and diesel fuel totaling $193,200. Costs are estimated for all necessary materials. 24 1,250 30,000. UNIT RATE (RS) UNIT (E) In equal installments over the contract period. This document is a bill of quantities for plumbing works for a building refurbishment project. 5mm wiring, 1000 meters of 2x2. a loading of minimum suitable for apartment loading comprising 150mm precast beams with 100mm block infill; cement slurry grouting to joints with (1:3) mix mortar Floors: Ground Level C 150mm minimum 413 m2 Design and install Precast concrete beam and block composite flooring system; designed for a loading of minimum suitable for apartment 1) The document is a bill of quantities listing various counters for a construction project including vanity counters, pantry counters, wash basin counters, kitchen sink counters, and lab counters. The estimate provides a ballpark figure, while the BOQ breaks it down into specific items. 2 million for BOQ 2 works. A well-prepared BOQ can help maintain a project's budget, ensure all necessary materials are accounted for, and streamline communication with suppliers, contractors, and clients. It includes estimated costs for site preparation, site works, concrete works, masonry works, plastering works, roof framing, roofing, ceiling works, finishing/tiles works, plumbing works, and electrical works. Concrete quantities include 19. Some of the key details include: - Item 1 describes excavation work for laying pipes up to 300mm diameter, with a depth of up to 2 meters. Apr 6, 2016 · Download A Collection of Bills Of Quantities (BOQ) Excel Sheets for MEP Projects. Some key points include: - Excavation work will remove any existing structures and soil according to the engineer's specifications. Ban of Queensland Limited ABN 32 00 5 40 (BOQ). Photo/ Daily Monitor. 1Provide for Engineer's Offices including , furniture, printer/copier/scanner, internet, security, water and electricity and maintainance including all office consummables as directed by the Engineer. 44 3 Cum Rate only 4 i) For Footings Cum 141. It includes 13 elements for the substructure, building frame, walls, roof structure, windows, doors, finishes and other items. Restaurants; Places; Decoration; Cost Of Building Your Home. A bill of quantities (BOQ) is a document or format used in all type of tendering works in the construction industry in which materials, parts, and labor (and their costs) are itemized in tabular forms like in columns and rows. 23. It serves as your launchpad to bagging a project. Allow for electricity and water on site for use Allow for erection of sign post to PM approval D:\UP CARIM\UP CARIM 3\2021 03 21_1st draft of final plans\carim3boqandspecs\BOQCarimP3_Master. Dec 2, 2022 · Traditionally project cost plans are often prepared using an elemental approach. snzmf rhyaue rur mkpjk amavvka adn uzvrb klxc qzim ynjq